Milton traffic report: what to know about Interstate 89 and Exit 17 project this week

Posted

According to the Vermont Agency of Transportation, Monday through Friday 9 a.m. to 9 p.m. between Exit 19 in St. Albans and the Lamoille River Bridge in Milton (MM 102), traffic will be reduced to one lane southbound and one lane northbound, intermittently. The speed limit is reduced to 55 mph within the construction area. Motorists should be aware that fines are doubled when speeding through a construction zone. 

Improvements are underway at the Interstate 89 Exit 17 interchange and the U.S. Route 2 and U.S. Route 7 intersection. Monday through Friday, Interstate 89 will be reduced to a single lane in both directions near Exit 17 during off-peak hours: 6 a.m. to 3 p.m. on Interstate 89 northbound and 9 a.m. to 8 p.m. on Interstate 89 southbound. The Interstate 89 northbound off-ramp slip lane remains closed, with access to U.S. 2 maintained at the signalized intersection. The U.S. Route 2 eastbound slip lane to the Interstate 89 southbound on-ramp is now open. U.S. Route 7 between the Shell Gas Station and Wiley Road will have intermittent lane closures with alternating one-way traffic controlled by flaggers between 9 a.m. and 3 p.m. U.S. Route 2 between Jasper Mine Road and U.S. Route 7 will have lane shifts and possible lane closures with alternating one-way traffic during non-peak hours.   

Keep in mind that weather and other factors may affect the speed and activities of construction.

Comments

No comments on this item Please log in to comment by clicking here