MILTON– Students, educators and community members gathered at Milton High School yesterday evening to celebrate the grand opening of the Milton Innovation Center and its outdoor classroom.
A ribbon-cutting ceremony marked the official unveiling of the space, designed to provide students with hands-on learning experiences in innovation, design and construction.
The MIC represents years of collaboration between students, educators and community leaders. It was developed to address the needs of 21st-century learners, equipping them with tools and opportunities to explore career pathways in engineering, technology and design.
“This space is going to be a personalized high-tech learning opportunity that inspires our scholars to visualize a college or career pathway,” Milton Town School District superintendent Amy Rex said during the event. “Here, students can practice being entrepreneurs, innovators, artists, engineers, builders and crafters— all at the same time.”
The Milton Innovation Center is the culmination of a youth-adult partnership that began in 2021.
A dedicated “youth team” of MHS students played a key role in the design process, collaborating with educators and professionals to shape the vision for the center. In November 2021, students met with architects from TruexCullins to tour the space and discuss design plans, ensuring student voices were part of the project’s development.
The project was supported by $500,000 in grant funding and additional federal dollars from the American Rescue Plan Elementary and Secondary School Emergency Relief fund.
Construction on the outdoor classroom began Sept. 3, following the Milton Town School District school board’s approval of $103,894 in ARP ESSER funds for the project. The outdoor classroom extends the MIC’s mission by providing a space for students to work on large-scale projects and apply their skills in real-world scenarios.
“It just made sense to do it as an extension of the innovation center,” Rex said. “If students had a big project and they were using woodshop tools, they could bring it out there to work.”
Housed within Milton High School, the MIC includes cutting-edge tools such as 3D printers, a laser cutter, electronic prototyping equipment, embroidery machines and more.
These resources enable students to design, prototype and fabricate projects across disciplines, bridging classroom learning with practical applications.
Design studio classes, previously held in the high school health room, now have a dedicated space in the MIC.
“It’s nice to finally have the space where students can really work with these tools and to watch their skill sets grow,” Ryan Bushey, a teacher at Milton High School, said.
The project faced delays due to the discovery of polychlorinated biphenyls (PCBs) in the school building. PCB remediation, which included removing the concrete floor in the center, was completed under strict Environmental Protection Agency guidelines.
Stewart Construction, the contractor for the $1.4 million Milton Innovation Center project, oversaw the remediation process.
Specialized environmental teams were brought in to handle the removal of PCB-contaminated materials, ensuring compliance with federal regulations. The process included extensive testing, air quality monitoring and the safe disposal of hazardous waste.
The MIC’s mission is to provide a flexible, hands-on environment for students to explore their passions with the mentorship of educators and community professionals. It also aligns with MTSD’s broader efforts to adapt educational programs to meet the evolving needs of students.
School board chair Kumulia Long and Milton High School Principal Scott Sivo cut the ribbon to inaugurate the center.
The space is officially fully operational for students in their second semester of the 2024-2025 school year.
Comments
No comments on this item Please log in to comment by clicking here